DFW contractor owner guide

Don't add a crew until you know where the work will come from

DFW issued fewer single-unit housing authorizations in 2025 while authorizations for larger residential structures increased. Before adding payroll, check the customers, projects, bids, costs, cash, crew, and margin behind the hire.

Namethe work and customers
Checkreal jobs and a way to bid
Hireonly after the numbers work

What changed in DFW

Housing authorizations moved in different directions

DFW authorization measure20242025Change
All housing units authorized71,78866,179-7.8%
Single-unit authorizations46,44039,790-14.3%
Structures with 5+ units624786+26.0%

These Census records count authorizations for new privately owned housing in the Dallas-Fort Worth-Arlington CBSA. They do not count starts, completed projects, electrical permits, awarded work, contractor revenue, bid access, or job margin. The 624 and 786 figures count structures; authorizations for housing units in those structures rose from 23,150 to 24,607, or 6.3%.

Before you hire

Decide what you can sell and deliver

01

Keep building single-family work

This can make sense when current builder relationships still produce acceptable jobs and your backlog supports the crew you already have.

  • List backlog and expected gross profit by builder.
  • Find other builders that fit your work before one customer becomes too much of the schedule.
  • Do not treat a metro decline as proof that every builder or service area is shrinking.
02

Check specific multifamily work

This can make sense when you know the owner, developer, or GC and can get on the bid list or complete prequalification for work that fits your company.

  • Name the project, customer, and electrical scope.
  • Check schedule, bonding, safety, insurance, experience, cash timing, and supervision.
  • Do not build a crew around a permit count.
03

Wait to hire

Waiting is reasonable when you cannot verify the work, customer, timing, bid process, costs, or margin without putting booked work at risk.

  • Keep a list of customers and jobs worth watching.
  • Check again when a project, contact, or prequalification requirement changes.
  • A new payroll and truck payment need more support than a market headline.

Before you add payroll

Use a 30-day hiring check

The 5-3-2-1 count below is a hypothetical company rule, not a DFW benchmark, expected conversion rate, or guarantee.

  1. 5
    List five real customers or GCs

    Use actual builders, owners, GCs, property managers, or other customers. A broad market category does not count.

  2. 3
    Confirm how three accept bids or estimates

    Find the contact, bid list, invitation, or prequalification step and record what your company must provide.

  3. 2
    Find specific work and a next step for two within 30 days

    Record the project or recurring need, electrical scope, timing, next call or submission, and any known reason your company would not qualify.

  4. 1
    Price and check one job

    Check the bid against job costs, added hiring and truck costs, available cash, collection timing, supervision, and the profit and margin your company requires.

When to stop

If you cannot identify specific work and a next step for at least two customers or GCs within 30 days, pause the hire. Change the customer list, the kind of work, or what you are offering before taking on the added cost.

Printable tool

One hiring sheet for each customer or GC

Print one copy for each customer or GC. Complete the profit and cash fields before adding a crew or truck.

01

Customer or GC

02

Builder, owner, property manager, or purchasing contact

03

Bid list, estimate request, or prequalification step

04

Specific project, recurring work, or service call

05

Electrical scope your crew can perform

06

License, insurance, safety, bonding, and experience requirements

07

Expected bid, award, and start dates

08

Current backlog and available supervision

09

Revenue, materials, subcontractors, payroll, and other job costs

10

Required profit floor: $____

11

Required margin: ____%

12

Available uncommitted cash: $____

13

One-time hiring and equipment costs: $____

14

Collection-delay reserve: $____

15

Profitability check: pass / fail

16

Cash check: pass / fail

17

Hiring decision: hire / wait

18

Next step, owner, and date

19

Reason to stop pursuing the work

30-day countCustomers or GCs listed __ / 5Bid or estimate process confirmed __ / 3Specific work and next step found __ / 2Job priced; profit and cash passed __ / 1
Start this week
  1. Choose the kind of work you want to test.
  2. Complete five customer sheets.
  3. Assign the next step and date for each.
  4. Review the results after 30 days before you hire.

Worked examples

Run the hiring question through your own company

AKeep the single-family crew busyHypothetical, not a DFW benchmark

A three-crew company has 45% of its next 90 days of booked work tied to two single-family builders. No other builder has invited an estimate for a job that fits the schedule, so the owner waits. An awarded job that passes the hiring sheet's profit and cash checks would change the decision.

BCheck an apartment renovationHypothetical inputs, not a market forecast

A service-heavy company knows a GC prequalifying subcontractors for common-area electrical and service upgrades. The scope, schedule, bid requirements, insurance, license coverage, and supervision fit the company.

Profit check: pass$240,000 revenue - $105,000 materials and subcontractors - $78,000 field payroll and burden - $12,000 other job costs = $45,000 left, or 18.75%.After $18,000 in one-time truck, recruiting, and setup costs, $27,000 remains. That is $3,000 above the company's $24,000 floor.Cash check: failThe company has $29,000 available. Setup costs plus a $12,000 collection-delay reserve require $30,000, leaving a $1,000 shortfall.

Decision: wait. Hire only when available cash reaches $30,000 or payment terms reduce the reserve to $11,000 or less, while profit and supervision still pass.

These are hypothetical company numbers, not DFW benchmarks. A collection-delay reserve is cash kept available while waiting to be paid, not an expense.

Sources and limits

What the public records can and cannot decide

Permit authorizations are local construction approvals, not a forecast of work or profit for one contractor.